How churches did it
Real jobs at real churches, done with the same steps as the templates: what it took, and what went wrong on the way.
St. Clement’s, Manhattan
A church, an Off-Broadway theater and a food pantry in one building on West 46th Street. A part-time priest, no staff, and a handful of volunteers. Read the whole story

The website
Six pages went live on the church’s own address on October 30, 2026. With the brand, it took about 20 hours over several weeks.

The brand
Sixteen steps, each a short lesson, two or three options and one pick. About a hundred drawings of the anchor were set aside before one held up at every size.
The bulletin
Sixteen pages, 21 minutes from the first message to the approved copy, one Wednesday night. The first draft split the Alleluia across two pages.
The vestry finance report
Straight from QuickBooks, which Claude can read and cannot change. The September report took 22 minutes and five questions.
The accounting manual
How the money works, written down from old emails, two older guides and a scanned agreement from 1957.
Your church next
Every one of these is a free template with the steps. Or we can build it with you.