St. Clement’s, Manhattan
A church, an Off-Broadway theater and a food pantry in one building on West 46th Street, with a part-time priest and no staff. In the fall of 2026 it replaced its website, rebuilt its brand, and wrote down how its money works.


Where it started
Stephen Setzer, who makes Handbuilt, is the priest-in-charge of St. Clement’s. He serves there part time, and for years a handful of volunteers have held the parish together.
The website was out of date. Announcements stayed up a year after the event, and a first try at fixing it in Squarespace did not get far. The logo was an anchor made on a free design account. It blurred when it was enlarged and could not be made small enough for a browser tab.
Everything below was done by one person working with Claude, from a folder on his computer that holds the church’s brand, website, bulletins and history.
The brand
The brand came first, because the website, the bulletin and the print all draw on it. It ran as sixteen steps. Each step was a short lesson, two or three options and one pick, and every pick was written down with its reason.
The brief was to keep the anchor and rebuild everything around it. Getting the anchor right took the longest. About a hundred drawings were set aside before one held up in black, in reverse, and at the size of a browser tab.
The result is one typeface for headlines, one red, and six looks drawn from the building itself, such as its chapel glass and its show bills. Here is one poster in each.

Chapel glass 
Hymnal 
Anchor 
Show bill 
Prompt book 
46th Street
The website
The first decision was who would update the site, because that decides how it is built. The answer was the priest and a volunteer, in plain words, with Claude. So the church built its own site instead of restyling the old one.
The design took sixteen rounds over four days, which was too many. Without a finished brand to work from, the drafts kept coming back flat and ordinary. Once the brand book and the six looks were in the folder, the pages came together quickly. The template now settles the look first and stops at three rounds.

Round 5 
Round 13 
Round 26 
The page that went live
Six pages went live on October 30, 2026: Home, Theater, Food Pantry, History, Give and Contact. The church kept its own address and its own account for it. Apart from his Claude subscription, the priest paid nothing for the new site. The brand and the website together took about 20 hours, spread over several weeks.

The site as it is today. Scroll it, or open stclementsnyc.org.
The bulletin
One Wednesday night the Sunday bulletin took 21 minutes from the first message to the approved copy: sixteen pages that fold into four sheets. The hymns came from the music director’s folder, and the readings were checked against the lectionary.
The first draft was not right. A sung Alleluia split across two pages, and a line of the Creed wrapped badly. The priest pointed at each one, it was fixed, and he looked again before approving. It then went by email to the people who review it each week.
The books
The vestry needed more than a snapshot against the budget. A monthly report now comes straight from QuickBooks, which Claude can read and cannot change. The September report took 22 minutes and five questions, two days after the month ended.
The harder job was writing down how the money works. Much of it lived in old emails and in people’s heads. Claude read the emails, two older guides and a scanned agreement from 1957, and drafted a manual. It took a while, and it meant making decisions that had been put off.
The vestry finance report template · The accounting manual template
What it taught us
Give the agent real material. Left alone, it produces work that looks like everyone else’s. With a brand book, real photos and the church’s own history, it produces work that looks like this church.
A first draft is a draft. Every job above had something wrong the first time, and a person caught it. Nothing was printed, posted or sent until that person approved it.
It is not easy, and it is within reach. A church this size could not have paid for this work. It took time and attention instead.
Do this at your church
Each job above is a free template with the steps. Or we can build it with you.